Running the Job What the Best Contractors Do Before Day OneThe ten days between a signed contract and your first day on site are where you stand out from every other bid the homeowner took. Here is how the best in the business use those days.
Two crews. Same trade, same town, same kind of job. One finishes a kitchen in four weeks with a homeowner who sends them referrals. The other finishes the same kitchen in seven weeks, with a long list of things to fix and a final bill nobody wants to talk about. I have stood on both job sites. The second crew was not worse with their hands. More than once, they were better. The difference was not the tools and not the people. The difference was what happened between the day the contract was signed and the first day on site. The first crew treated those ten days as part of the job. The second crew treated them as waiting around for the job to start. Everything after followed from there. Here is the part most contractors miss. Those ten days are the only time the homeowner is watching you with nothing else to judge you by. No dust yet. No noise. No bill. Only how you run things. A homeowner who took three bids has met three people who swing a hammer. The one who shows up in the first ten days with a clear plan, real dates, and one plain rule about changes is the one they tell the neighbors about. I grew up around the people who ran our jobs. The good ones had a method, even when they never wrote the method down. This is my try at writing the method down. Day one: write down exactly what you are doing, and what you are notAlmost every argument I have ever seen on a job started with a vague scope. "Remodel the master bath" is a wish. "Take the bathroom down to the studs, new plumbing inside the existing walls, tile up to four feet on the three wet walls, paint above the tile, two new GFCI outlets and no other electrical" is a plan. With the first one, the homeowner fills in the blanks with whatever they are hoping for. With the second one, everybody knows what was bought and what was sold. Break the scope into parts, each with its own price. Tear out. Rough work. Finish work. Allowances. And a section called What Is Not Included. The homeowner sees where every dollar goes. A change to one part never messes up the rest. The Not Included section is the one most contractors skip, and the one worth the most. Writing down what you are not doing is not being negative. Writing down what you are not doing is how a pro shows they have done this before and know where the surprises hide.
Days two and three: build the schedule around what you have to wait forCustom cabinets take eight to twelve weeks to show up. Special order windows take six to ten. A new electrical panel waits on the power company. An inspection waits on the city. None of those dates care whether your framer is free on Tuesday. So the best project managers work backward. Write down every item on the job you have to wait more than a week for. Start from the day each one has to go in, count back, and there is your order date. Those order dates go on the calendar before the start date does. Then line up the trades around those dates, not around who happens to be free. Plumbing rough before electrical rough where they share a wall. Insulation inspection before drywall. Drywall before the painter is booked. And leave one open day between each trade. The open day is not wasted time. The open day is what keeps your finish date alive when one delivery shows up late. When the tasks, the people, and the dates live in one place the crew lead sees on their phone, the schedule survives a bad Tuesday. When the schedule lives in the project manager's head, one sick day costs a week. Day four: the kickoff meeting, and the one rule you say out loudThe kickoff is where you set expectations, and expectations are the whole game. Sit down with the homeowner and go through the scope one part at a time. Read the Not Included section out loud and ask them to tell you back what is not in the job. Show them the schedule with the order dates marked, and say plainly which dates you control and which ones you do not. Then say the change rule. Say the rule once, say the rule kindly, and never apologize for the rule again: no work outside what we agreed on starts until you approve a written change with a price and a new date. Every time. Especially the small stuff, because the small stuff is what a homeowner forgets agreeing to. When a change request comes in, price the change the same day. Give the schedule hit in days, not in vague words. "This adds four working days and moves the final walk from the 14th to the 20th" is a decision a homeowner makes in a minute. "This will push things back a little" is an argument at the final bill. Finish the kickoff by agreeing how you will talk. One update a week, same day, same way. Photos where the homeowner sees them without calling you. Decisions in writing. One person on their side makes decisions. One person on your side answers questions. Everybody else is copied in. Days five through ten: set up the habits the job runs onBig commercial builders have done this for decades, and most residential crews do not. Every Friday, sit down for ten minutes with your crew lead and write out the next three weeks. Who is on site each week. What material has to be there before they show up. What inspection or homeowner decision has to happen before the following week begins. The third week out is where the money is. A problem you see three weeks ahead is a phone call. The same problem on Monday morning is a crew standing in a driveway on your dime. Add a seven minute talk on site every morning before the first cut. What got done yesterday. What gets done today. What is in the way. The morning talk is where a foreman tells you the tile came in two boxes short, and you fix the shortage before the tile setter arrives instead of after. And treat photos like part of the work, not paperwork you do after. Take a picture of everything before you cover the work up. Plumbing before drywall. Flashing before siding. Conduit before the pour. Keep every photo with the job, not on somebody's personal phone. Let whoever did the work mark up the photo, which is often the apprentice who pulled the wire. Close each day with two lines: what got done, what is in the way. Those photos are worth more than any warranty paperwork, and a homeowner who sees them trusts you with the next job. The last ten percent starts on day oneThe last ten percent of a job burns thirty percent of the goodwill. So walk the job yourself before the homeowner walks the job. Write the list of what still needs attention, put a name and a date on every line, and send the list before anyone asks for one. A homeowner who gets your list first has nothing left to say except thank you. Then close out the money the same way you opened the scope: part by part, against the price they agreed to plus the changes they approved, with what is paid and what is owed on one page. The last conversation about money takes two minutes, because every number on the page was agreed to in writing weeks ago. Close out is a review, not a negotiation, and you set up the review on day one. Why we built CT1 around thisNone of this needs software. All of this gets easier when the whole job lives in one place: the scope in parts, the schedule with the order dates, the crew and their tasks, the photos, the changes, the money, and the homeowner's own window into the whole thing. One record, in the order things happened. Fewer places for information to hide. Fewer things a project manager carries home in their head. Where CT1 is headed over the next few months is more of exactly this, plus short training videos, one topic at a time, so a new project manager learns the CT1 way of running a job in an afternoon. The habits come first. The platform exists to make the right habits the easy ones.
What You'll See in Future IssuesRunning jobs, estimating and cash flow, real jobs run on CT1, and a note from the CT1 leadership team each month.
| ||||||||