Scope of Work for Contractors: What to Include, With a Free Template

A scope of work tells your customer exactly what you will do, and what you will not do. It is the part of an estimate people argue about most when a job goes wrong. A clear one helps you win the job, get paid, and avoid the words every contractor dreads: "I thought that was included."

Published

What Is a Scope of Work?

A scope of work is a written list of the work on one job. It names the area, the tasks, the materials, and the finished result. It sits inside your estimate or contract, right next to the price.

The price says how much. The scope says what for. When the two match, customers say yes faster and pay without a fight.

The Nine Things Every Scope Should Include

1. Job address and area. Which rooms or parts of the house, with rough sizes. Example: main bathroom, second floor, about 5 by 8 feet.

2. Tear-out. What comes out and who hauls it away.

3. The work, step by step. Write it in the order your crew will do it.

4. Materials. Brand, color, or grade when it matters, and who buys them.

5. What is not included. Permits, painting, moving furniture, hidden damage behind walls.

6. Allowances. A set dollar amount for items the customer picks later, like tile or fixtures.

7. Timeline. Start date, how long it should take, and what could delay it.

8. Cleanup. Daily and at the end of the job.

9. How changes work. Any change is written down and approved before the work is done.

Vague vs. Clear: Three Examples

Vague: Install new flooring.

Clear: Remove carpet in main bedroom (14 by 16 feet). Install 224 sq ft of vinyl plank with trim and doorway transitions.

Vague: Paint kitchen.

Clear: Patch nail holes. Prime and paint walls, two coats, customer's color. Ceiling and cabinets not included.

Vague: Fix the deck.

Clear: Replace 6 rotted deck boards on the east side to match. Railings and staining not included.

The clear version takes one more minute to write. It can save you a week of back and forth.

Common Mistakes to Avoid

Leaving out the not-included list. This causes more fights than anything else. If you are not doing it, say so.

Using words only you understand. Write for the homeowner, not the crew.

No change process. Without one, extra work turns into free work.

Writing the scope after the price. Write the scope first, then price each part. Your numbers will be easier to explain.

Free Scope of Work Template

Copy this and fill in the blanks.

Job address:

Area of work:

Tear-out and haul-away:

Work to be done: 1. 2. 3.

Materials (and who buys them):

Allowances:

Not included:

Start date and expected length:

Cleanup:

Changes: Any change to this scope will be written and approved by the customer before the work is done.

Customer signature and date:

Contractor signature and date:

CT1

Platform Solution

How myCT1 Business-in-a-Box Solves This

In CT1 you do not have to type a scope from scratch. Open Create Estimate on your phone and just talk through the job, or type it. CT1 turns what you said into written scope wording and line items with quantities and prices.

On the Review screen you can tap Edit your wording to change the scope in your own words, then tap Add Edited Wording. You can also tap Edit the work or Edit deposit and tax before you send. Your customer gets a branded estimate they can open, zoom in on, and sign online. When they sign, CT1 turns the estimate into a job, and the scope, line items, and customer details carry over. If the job changes later, send a change order for the customer to approve.

Want to show the customer the finished look too? Add a CT1 Redesign picture to the estimate.

CT1

Ready to Run Your Business Like a Pro?

The myCT1 Business-in-a-Box gives you everything you need to manage leads, estimates, jobs, invoices, and more - all in one platform built for contractors.

Frequently Asked Questions

Is a scope of work the same as an estimate?

No. The estimate is the price. The scope of work is the list of tasks the price covers. Most estimates include both.

Who writes the scope of work?

The contractor usually writes it. The customer reviews it and signs it with the estimate or contract.

How long should a scope of work be?

As long as it takes to be clear. A small repair may need five lines. A full remodel may need a page or more.

What if the customer wants changes later?

Write up a change order with the new work and price, and get it signed before you start the extra work.